How to pave SBS elastomer modified asphalt waterproof roll?
Time:
2020-03-16
Removal of the original exposed waterproof layer: the construction personnel shall wear labor protection appliances before entering the site for construction. After entering the site, the aged waterproof layer on the leveling layer shall be chiseled away until the base surface of the original mortar protective layer;
1、 Base treatment:
① Removal of the original exposed waterproof layer: the construction personnel shall wear labor protection appliances before entering the site for construction. After entering the site, the aged waterproof layer on the leveling layer shall be chiseled away until the base surface of the original mortar protective layer;
② Clean the base surface of mortar protective layer, and conduct leveling and repair;
2、 Material inspection:
The size and appearance of waterproof coiled materials must meet the requirements of specifications and product instructions.
3、 Operating conditions:
1. The base course shall be basically dry, and the waterproof layer shall be made after the surface is dry (the moisture content shall not be greater than 9%).
2. The flashing slope of the base course is more than 2%, and no ponding is allowed.
3. Cement mortar shall be plastered into small round corners at corners of the base course.
4. The materials must be sealed and stored in a cool and dry place. It is strictly prohibited to contact with water.
5. Fireworks are strictly prohibited at the storage and construction sites.
4、 Full adhesion of coiled material:
Position in advance to make the laying position of coiled material accurate. The primer shall be applied thinly, without leakage or accumulation. After it is dried to the point where it does not stick to the hands, the coil shall be fully melted. When pasting, the coiled material shall not be stretched. After pasting, roll forward and to both sides with rubber roller to exhaust air, so that the coiled material is firmly stuck to the facade base course.
5、 Precautions:
1. It is strictly forbidden to damage the waterproof layer with construction tools or sharp objects. It is forbidden to mix mortar on the waterproof layer.
2. The place where materials are stored and the construction site must be well ventilated.
3. Fireworks are strictly prohibited at the material storage and construction sites.
① Removal of the original exposed waterproof layer: the construction personnel shall wear labor protection appliances before entering the site for construction. After entering the site, the aged waterproof layer on the leveling layer shall be chiseled away until the base surface of the original mortar protective layer;
② Clean the base surface of mortar protective layer, and conduct leveling and repair;
2、 Material inspection:
The size and appearance of waterproof coiled materials must meet the requirements of specifications and product instructions.
3、 Operating conditions:
1. The base course shall be basically dry, and the waterproof layer shall be made after the surface is dry (the moisture content shall not be greater than 9%).
2. The flashing slope of the base course is more than 2%, and no ponding is allowed.
3. Cement mortar shall be plastered into small round corners at corners of the base course.
4. The materials must be sealed and stored in a cool and dry place. It is strictly prohibited to contact with water.
5. Fireworks are strictly prohibited at the storage and construction sites.
4、 Full adhesion of coiled material:
Position in advance to make the laying position of coiled material accurate. The primer shall be applied thinly, without leakage or accumulation. After it is dried to the point where it does not stick to the hands, the coil shall be fully melted. When pasting, the coiled material shall not be stretched. After pasting, roll forward and to both sides with rubber roller to exhaust air, so that the coiled material is firmly stuck to the facade base course.
5、 Precautions:
1. It is strictly forbidden to damage the waterproof layer with construction tools or sharp objects. It is forbidden to mix mortar on the waterproof layer.
2. The place where materials are stored and the construction site must be well ventilated.
3. Fireworks are strictly prohibited at the material storage and construction sites.
Related information
Related products
Elastomer (SBS) modified asphalt waterproof roll
Elastomer modified asphalt waterproof coiled material is made of SBS (styrene butadiene styrene) thermoplastic elastomer modified asphalt as the dip coating material, high-quality polyester felt, glass fiber felt, glass fiber reinforced polyester felt as the base, fine sand, mineral particles, PE film, aluminum film, etc. as the covering material, and special machinery for mixing and grinding.
View Details+
Self adhesive polymer modified asphalt waterproof roll
The self-adhesive polymer modified asphalt waterproof coiled material is made of SBS and other synthetic rubber, high-quality road asphalt and tackifier as the base material, polyester film (PET), polyethylene film (PE), aluminum foil or silicon coated isolating film as the upper surface material, and silicon coated isolating film as the anti sticking layer on the lower surface.
View Details+
Root puncture resistant polyvinyl chloride (PVC) waterproof roll
PVC root puncture resistant waterproof roll is a polymer waterproof roll with high performance developed by our company and has root puncture resistance. The company adds chemical reagents to ordinary PVC to make the material root wearable, so as to stop the growth of plant roots.
View Details+
EPDM waterproof coiled material is made by adopting the internationally advanced cold feeding extrusion continuous vulcanization process equipment, selecting high-quality EPDM rubber and raw materials, adding processing aids such as blackening reinforcing agent, nano modifier, plasticizer, vulcanization accelerator, etc., through the processes of internal refining, refining, filtering, extrusion molding, continuous vulcanization, inspection, etc.
View Details+